Most of the delay between agreeing a crew and seeing it on site is not the supplier's. A breakdown of each leg, and which one is usually the long pole.
READ →A lift needs more roles than a rigger. Who does what, which certification matters, and why the banksman is the one position worth never leaving short.
READ →Plumber and pipefitter are not two words for the same worker, and asking for the wrong one is the most common reason a plumbing crew underperforms on a UAE site.
READ →Workshop fabrication and site installation need the same job title and genuinely different workers. Why one mechanical fitter request often needs to be two.
READ →A welder is only qualified for the procedure, position and material they were tested on. What that means when you request a crew, and what to put in the request.
READ →Ask for carpenters on a UAE construction site and you will usually be offered shuttering carpenters. If you wanted joinery, that is the wrong crew, and the word alone will not tell either side.
READ →A mason only lays as fast as the material reaches them. Why blockwork and plastering crews are sized around the supply chain to the wall, not around the masons.
READ →Flagmen are among the first roles cut from a crew and among the hardest to do without. The situations that call for one, and why they should not be a spare pair of hands.
READ →Scaffold is the one temporary works package that other trades depend on completely. What to specify when requesting erectors, and who holds the inspection and the handover.
READ →General helper is the most under-specified request a supplier receives. Saying what the helpers will support, rather than how many you want, is what makes the crew useful.
READ →Construction cleaning and facilities housekeeping look like one service and are staffed completely differently. Which one you are buying changes the crew, the shift and the duration.
READ →Assistant electricians are not cheap electricians. Understanding where the line sits between the two is what makes a mixed electrical crew cost less without slowing down.
READ →Hiring workers onto your own establishment and taking them on supply are not two prices for the same thing. They are different commitments, and the difference shows up when the project ends.
READ →Steel fixing is the trade most often requested as a bare headcount, and the one where a bare headcount tells the supplier least. What to specify instead.
READ →Four pieces of information turn a vague enquiry into a firm answer on availability and mobilisation. What to include, and what slows a quote down.
READ →Why the licence matters to the contractor using the labour, not just the supplier providing it, and what to check before the first worker arrives on site.
READ →MEP trades are supplied together because the work runs together. Which trades make up a crew, what each one does, and how the mix changes from first fix to commissioning.
READ →A shutdown and a multi-year programme need different arrangements. How to decide between short term and long term contract manpower, and how one rolls into the other.
READ →Who employs the workers, who directs them, and what sits with each side. A plain explanation of the manpower supply arrangement for contractors hiring in the UAE.
READ →Five ways to put people to work on a UAE project, and how to choose between them: who directs the work, how long you need it, and how much of the job you hand over.